Skip to main content
  1. Home
  2. Space
  3. News

NASA names winner of a $93 million lunar lander contract

Add as a preferred source on Google

NASA has dished out $93.3. million to Firefly Aerospace to help it deliver a suite of 10 science investigations and technology demonstrations to the moon in 2023.

The Cedar Park, Texas-based company will use its Blue Ghost lunar lander (below) to deliver the payloads weighing a total of 94 kg to the moon’s Mare Crisium basin. A launch vehicle for the mission is yet to be decided.

An illustration of Firefly Aerospace’s Blue Ghost lander on the lunar surface. Firefly Aerospace

Firefly’s moon trip will aim to investigate a range of lunar surface conditions and resources as part of preparations for the next human landing expected to take place no earlier than 2024.

Recommended Videos

“The payloads we’re sending as part of this delivery service span across multiple areas, from investigating the lunar soil and testing a sample capture technology, to giving us information about the moon’s thermal properties and magnetic field,” NASA’s Chris said in a release on Thursday, February 4. Specific details on each of the payloads are available on NASA’s website.

The award is part of NASA’s Commercial Lunar Payload Services (CLPS) initiative — a key element of the Artemis spaceflight program — that involves the agency hiring the services of commercial partners for future moon missions. This is the sixth award for lunar surface delivery under the CLPS initiative, NASA said.

Firefly said it was “honored to be selected by NASA,” adding that its 330-strong team of aerospace professionals is continuing development work on its Alpha rocket and SUV spacecraft as it seeks to become one of America’s leading space transportation providers, ultimately competing with the likes of SpaceX.

Space fans will be hoping Firefly can meet the 2023 goal for its ambitious mission, as all too often such timelines run into issues. NASA’s plan to put the first woman and next man on the moon, for example, looks set to miss the 2024 target date as a slew of issues that include funding challenges, rising costs, and unexpected schedule delays take their toll.

Fancy taking a quick trip to the moon right now? Then check out this impressive flyover of our nearest neighbor created using footage and photos captured by a lunar orbiter.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Amazon’s Starlink rival is set to launch satellite internet later this year
After launching nearly 400 satellites, Amazon says its Leo broadband service will go live later this year.
Atlas V launches 29 Amazon Leo satellites from Cape Canaveral, Florida

Amazon's long-awaited answer to SpaceX's Starlink is finally nearing liftoff. According to an exclusive report from Reuters, the company plans to begin offering its Leo satellite internet service later this year, after its latest rocket launch pushed the constellation to 394 satellites in orbit.

The pieces are finally falling into place for Project Kuiper

Read more
NASA is investing $590 million in private contractors to build humanity’s first Moon outpost
NASA is counting on private companies to land its Moon Base dream.
Artist impression of a Moon Base concept, with solar arrays for energy generation, greenhouses for food production, and habitats shielded with regolith.

Building a permanent base on the Moon sounds like science fiction, but NASA is making it feel a lot more real. The agency just handed $590 million in contracts to three private companies for four uncrewed lunar lander missions launching in late 2028.

These missions are part of Phase 1 of NASA's broader $30 billion Moon Base program, which needs to deliver landers, rovers, and scientific cargo up there before astronauts eventually move in. These efforts are closely tied NASA's Artemis program, which sent humans on a lunar flyby in April for the first time since the Apollo era.

Read more
Getting to Mars may require a pit stop in orbit, and NASA just tested the nozzle to make that happen
A gas pump nozzle for spacecraft sounds simple. It is not, and that's what makes this test worth paying attention to.
Architecture, Building, Factory

Getting a spacecraft to Mars or beyond requires an enormous amount of fuel, most of which has to be hauled from Earth, adding to the overall cost and weight of the spacecraft. NASA has been working on a different approach, one that could be more efficient and effective.

It wants to refuel a spacecraft in orbit before heading out for the mission. What’s even more interesting is that the space agency just finished testing a component that could make that possible: a cryocoupler.

Read more