Skip to main content

Watch NASA’s cinematic trailer for its upcoming moon mission

In the same week that NASA announced targeted dates for the maiden launch of its mega moon rocket, the agency has dropped a cinematic trailer (below) to spread the word about the mission.

Scheduled to take place as early as August 29, the much-anticipated Artemis I mission will usher in a new era of human space exploration that will involve returning astronauts to the lunar surface after a 50-year absence. NASA’s Artemis program is also aiming to establish a sustainable human presence on the moon and use it as stepping stone for the first crewed mission to Mars.

Artemis I Launching to the Moon: Official NASA Launch Trailer

Short and sweet, NASA’s Artemis: Launching to the Moon trailer depicts the powerful Space Launch System (SLS) rocket launching the Orion capsule to space. Artemis I will involve sending the Orion on a flyby of the moon before bringing the spacecraft home.

Recommended Videos

“Artemis I will be the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, SLS rocket, and the ground systems at Kennedy Space Center in Cape Canaveral, Florida,” NASA says in notes accompanying the video. “The first in a series of increasingly complex missions, Artemis I will be an uncrewed flight test that will provide a foundation for human deep space exploration, and demonstrate our commitment and capability to extend human existence to the moon and beyond.”

The long-awaited Artemis I mission will see Orion fly farther than any spacecraft built for humans has ever flown, with the capsule set to travel 280,000 miles from Earth and thousands of miles beyond the moon during a mission that will last up to six weeks.

“Orion will stay in space longer than any ship for astronauts has done without docking to a space station and return home faster and hotter than ever before,” NASA said.

If the SLS rocket and Orion spacecraft perform as expected during the Artemis I mission, then Artemis II, currently set for 2024, will fly the same route but with astronauts on board. A successful crewed flight will pave the way for Artemis III, possibly in 2025, which will put the first woman and first person of color on the lunar surface.

And then, while working to build a habitable base on the lunar surface, NASA will begin to focus more heavily on its boldest crewed mission since the first lunar landings five decades ago — an astronaut mission to Mars targeted for the late 2030s.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA’s axed moon rover could be resurrected by Intuitive Machines
An illustration of NASA's Volatiles Investigating Polar Exploration Rover (VIPER) on the lunar surface.

Lunar scientists were shocked and dismayed last month when NASA announced that it was canceling work on its moon rover, VIPER. The Volatiles Investigating Polar Exploration Rover was intended to search the moon's south pole for evidence of water there, but NASA said that it had to ax the project due to increasing costs.

This week, an open letter to Congress called the cancellation of the mission "unprecedented and indefensible," and questioned NASA's assertion that the cancellation of the mission would not affect plans to send humans to the moon. Scientists argued that the mission was fundamental to understanding the presence of water on the moon, which is a key resource for human exploration, as well as an issue of scientific interest.

Read more
Watch NASA astronauts use VR to ‘explore’ upcoming lunar space station
A NASA astronaut uses VR to explore the Lunar Gateway.

NASA has shared footage showing astronauts using VR headsets to learn what it will be like aboard the Lunar Gateway space station.

The Lunar Gateway will orbit the moon and be used mainly for getting astronauts and cargo to and from the lunar surface during the upcoming Artemis missions. It'll also be used as a space-based laboratory similar to how the International Space Station, which is in low-Earth orbit, operates today.

Read more
Stuck Starliner is causing NASA to delay other ISS missions
SpaceX Crew-9 during training.

NASA has announced that it will delay the targeted launch date of SpaceX’s Crew-9 mission to the International Space Station (ISS) while it continues to work on resolving the situation with the troubled Starliner spacecraft.

The Starliner mission was only supposed to last about 10 days, but has been docked at the ISS since early June. An issue with some of the spacecraft's thrusters has prompted NASA engineers to carry out investigations to determine if the vehicle is safe to fly home with its two crew members on board.

Read more