Skip to main content

NASA’s new moon rocket to depart launchpad after failed test

NASA has decided to pause plans for a wet dress rehearsal involving its next-generation lunar rocket after a slew of issues over the last couple of weeks conspired to derail efforts.

The space agency said it wants to make some repairs, as well as assess the current situation, and will therefore roll the powerful SLS moon rocket and Orion spacecraft from the launchpad back to the Vehicle Assembly Building at the Kennedy Space Center in Florida.

NASA’s new SLS moon rocket arrived at the launchpad for the first time four weeks ago ahead of a test involving filling the rocket with fuel and a mock countdown.

The first attempt at the rehearsal took place at the start of this month, but was called off due to a fan issue impacting the rocket’s mobile launcher.

A day later, on April 4, a second effort was halted when engineers spotted a stuck valve on ground equipment linked to the test procedure.

The third effort, conducted last week, was a scaled-down procedure that focused on fueling only the core-stage tanks instead of attempting to fill the upper stage as well. But even this method hit a snag after engineers identified a liquid hydrogen leak, prompting the team to stand down.

It was initially hoped that the test could resume in the coming days, but NASA announced on Sunday that it was returning the rocket to the assembly building to make some fixes before trying again. The pause in proceedings has also been linked to work being carried out by an off-site supplier.

“Due to upgrades required at an off-site supplier of gaseous nitrogen used for the test, NASA will take advantage of the opportunity to roll SLS and Orion back to the Vehicle Assembly Building to replace a faulty upper stage check valve and a small leak on the tail service mast umbilical,” the space agency said. “During that time, the agency also will review schedules and options to demonstrate propellant loading operations ahead of launch.”

NASA will hold a media teleconference at 3 p.m. ET on Monday, April 18, to discuss the status of the wet dress rehearsal.

The failure to perform a successful wet dress rehearsal is a setback for NASA, though at the same time, such tests are designed to surface issues, allowing engineers to get everything right for launch day.

The rehearsal is the last big test before the uncrewed Artemis I mission, which will use the SLS rocket to power the Orion spacecraft on a fly-around of the moon. Launch is scheduled for no earlier than May, but the recent issues are likely to cause that target date to slip.

Following a successful Artemis I flight, Artemis II will take the same route, but this time carrying a crew on board. The highly anticipated Artemis III mission, currently set for no earlier than 2024, will put the first woman and first person of color on the lunar surface in the first crewed touchdown since 1972.

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA delays first crewed Artemis missions to the moon
An illustration showing astronauts on the moon.

NASA has delayed its plan to send four astronauts on a flyby of the moon in the Artemis II mission in November, announcing that it will now take place no earlier than September 2025.

In the same announcement made on Tuesday, NASA chief Bill Nelson said that the first crewed landing, originally planned for 2025 as part of Artemis III, will now launch in September 2026 at the earliest.

Read more
Five rocket launches to look out for in 2024
SpaceX's Starship rocket lifting off in November 2023.

This year promises a bunch of launches featuring new rockets from a range of operators. Let's take a look at five notable rocket launches that are sure to make headlines over the coming months:
ULA’s Vulcan Centaur

The first of these takes place on Monday, January 8, with United Launch Alliance conducting the maiden launch of its brand-new Vulcan Centaur rocket. The 202-feet-tall (61.6-meter) vehicle will launch from the Kennedy Space Center in Florida on a mission to become the first to land a privately built lander on the moon.

Read more
Fly your name to the moon as part of historic NASA mission
An illustration of NASA's Volatiles Investigating Polar Exploration Rover (VIPER) on the lunar surface.

Illustration of NASA's Volatiles Investigating Polar Exploration Rover (VIPER) on the surface of the Moon NASA Ames/Daniel Rutter / NASA Ames/Daniel Rutter

NASA likes to bring its missions closer to space fans around the world -- especially to the younger generation to get them interested in science subjects -- and part of these efforts involves the chance for people to fly their names on spacecraft heading off to explore parts of our solar system.

Read more