Skip to main content
  1. Home
  2. Space
  3. News

Odysseus lander mission expected to end early due to power issue

Add as a preferred source on Google

NASA and Intuitive Machines may have made history recently with the first U.S. lunar landing in more than 50 years, but it looks like the mission will come to an end much sooner than hoped. As the Odysseus lander came in for its descent last week, it caught on the surface and tipped over onto its side. Now, Intuitive Machines has announced that it expects the lander to stop communications on the morning of Tuesday, February 27 — cutting the mission shorter than the week or more on the surface that was originally hoped for.

Intuitive Machines also released a low-resolution image taken after the spacecraft pitched over, showing its view of the moon’s surface:

Odysseus captured this image approximately35 seconds after pitching over during its approach to the landing site. The camera is on the starboard aft-side of the lander in this phase
Odysseus captured this image approximately 35 seconds after pitching over during its approach to the landing site. The camera is on the starboard aft side of the lander in this phase. Image used with permission by copyright holder

“After understanding the end-to-end communication requirements, Odysseus sent images from the lunar surface of its vertical descent to its Malapert A landing site, representing the furthest south any vehicle has been able to land on the moon and establish communication with ground controllers,” the company wrote in an update.

Recommended Videos

The problem seems to be that the solar panels of the lander will soon stop collecting sunlight, so the lander will run out of power. “Based on Earth and moon positioning, we believe flight controllers will continue to communicate with Odysseus until Tuesday morning,” the company wrote.

In addition to this update, NASA also shared an image of the lander on the moon’s surface captured by the Lunar Reconnaissance Orbiter (LRO) spacecraft. It shows the dot of the lander as seen from orbit at an altitude of around 56 miles above the surface:

NASA’s Lunar Reconnaissance Orbiter captured this image of the Intuitive Machines’ Nova-C lander, called Odysseus, on the Moon’s surface on Feb. 24, 2024, at 1:57 p.m. EST). Odysseus landed at 80.13 degrees south latitude, 1.44 degrees east longitude, at an elevation of 8,461 feet (2,579 meters). The image is 3,192 feet (973 meters) wide, and lunar north is up.
NASA’s Lunar Reconnaissance Orbiter captured this image of the Intuitive Machines’ Nova-C lander, called Odysseus, on the moon’s surface on February 24, 2024. NASA/Goddard/Arizona State University

This shows that the lander is in a relatively steep crater of 12 degrees, which could have contributed to challenges with the landing.

It remains to be seen how much data the Odysseus lander will be able to collect and send to Earth given its limited supply of power. It’s also not fully known to what extent the tipping of the lander has impacted the payloads on board, although in an update last week, Intuitive Machines did say that at least some of the instruments were operational and collecting data.

Georgina Torbet
Georgina has been the space writer at Digital Trends space writer for six years, covering human space exploration, planetary…
SpaceX Starship reaches orbit for the first time but its historic flight ends early
Starship reaches orbit for the first time and deploys 26 Starlink satellites before an early splashdown.
spacex-starship

After 13 suborbital test flights and more than $15 billion in development costs, SpaceX's Starship has finally reached orbit. The 407-foot megarocket, the most powerful ever built, lifted off from Starbase, Texas, on Monday and delivered its first real payload on it's 14th attempt. The celebration came with an asterisk, though, since SpaceX had to cut the planned 10-hour mission to roughly three hours.

https://twitter.com/SpaceX/status/2104601695711904180

Read more
Starship is finally going orbital, and SpaceX has picked September 22
Flight 14 is aiming for orbit, Starlink V3 deployment and a very long day in space.
Starship rocket.

SpaceX is finally ready to give Starship its biggest test yet. The company says the massive rocket's 14th test flight is scheduled for September 22, when it will attempt to put the upper stage into Earth orbit for the first time. The launch is currently pending regulatory approval, with a 75-minute window opening at 7:15 a.m. CT.

Starship has 26 Starlink satellites to deliver

Read more
Want a city on the Moon? Scientists say there’s not enough water
A billion tons still comes up short
Artist impression of activities in a Moon Base.

For decades, humanity has looked up at the Moon and wondered what it would be like to live on it. Think sprawling cities, factories, research centers, and permanent human settlements. Unfortunately, there is one fairly fundamental problem with that vision.

A new study published in Frontiers in Space Technologies argues that even the Moon's potentially enormous reserves of frozen water may be nowhere near enough to support city-sized populations sustainably. Researchers Martin Elvis and Jonathan McDowell estimate that the permanently shadowed regions near the lunar poles could contain roughly one billion tons of water. It sounds like an extraordinary amount until you put a million thirsty humans next to it.

Read more