Skip to main content
  1. Home
  2. Computing
  3. News

Nvidia RTX 4090 cables may be melting in a worrying new way

Add as a preferred source on Google

Over the past few months, we’ve seen frequent reports of melting power connectors on Nvidia’s RTX 4090 graphics cards, leading to a wave of worry and speculation that something is seriously amiss. Now, a user has claimed their cable has melted in a dramatic new way — and it could suggest that the headaches are far from over for Nvidia.

According to Shiftyeyes67k on Reddit, the 12VHPWR cable that came with their RTX 4090 GPU melted on the power supply (PSU) side. In other words, the problem occurred where the cable connectors fed into the power supply, not where they met the graphics card, as has been the case with every other report of melting 12VHPWR connectors.

In the user’s own words, “Started noticing a smell coming from my PSU (BeQuiet Dark Power 13 1000w) recently that smelled like burnt plastic. Decided to swap it out and noticed that the 12VHPWR cable was burned from the PSU side?”

Recommended Videos

This is particularly worrying because, as the name suggests, the power supply fuels many other components within your PC. If a 12VHPWR cable becomes so hot that it melts right next to the power supply, there’s a risk that the PSU itself could suffer damage — and that anything connected to it may also be affected, potentially spreading the fallout much further within your PC.

What’s the cause?

The RTX 4090 graphics card on a table alongside a set of cables held in hand.
Jacob Roach / Digital Trends

Nvidia has previously investigated the issue of 12VHPWR connectors melting and concluded that the problem was down to user error — if cables are not pushed all the way in when connected to a graphics card, there is a risk of the connectors overheating and melting, the company said. Various solutions have been proposed by the likes of Intel and CableMod in an attempt to address the problem, yet even those are not immune to failure.

The post by Shiftyeyes67k raises two main possibilities. Either Nvidia’s 12VHPWR connectors are indeed faulty, despite Nvidia’s reassurances, or users are still having trouble plugging them in correctly.

Either way, this seems to be the first time we’ve seen a 12VHPWR cable melting on the PSU side. Whereas before the melting connector only risked damaging your graphics card, now there’s a chance it could take down your entire system.

That said, it’s unknown how widespread this issue is, and it’s worth treating it somewhat skeptically until we get further confirmation or comment from Nvidia. But whatever happens, it seems Nvidia’s 40-series woes aren’t over yet.

Alex Blake
Alex Blake has been working with Digital Trends since 2019, where he spends most of his time writing about Mac computers…
Claude Opus 5 is here, and Anthropic says it can rival Fable 5 in some tasks
Major software engineering improvements put Opus 5 closer to Anthropic’s top model
Claude Opus 5 logo

Anthropic has launched Claude Opus 5, its latest frontier AI model for coding, research, business work, and other complex tasks. The company says it delivers a major performance jump over Claude Opus 4.8 while keeping the same API price. Anthropic also claims it comes close to Claude Fable 5 on some coding and computer-use tests while costing far less per task.

Opus 5 is available across Claude’s apps and API. It is now the default model for Claude Max subscribers and the strongest option included with Claude Pro.

Read more
Humans actually prefer talking to an AI than a support person, says gas giant as it cuts jobs
British Gas cuts 1,300 support jobs as its CEO points to changing customer habits
Executive, Person, Electronics

Centrica, owner of British Gas, is cutting 1,300 call centre jobs, and its chief executive says changing customer behaviour is the main reason. The company plans to remove 800 roles as part of a “targeted deployment of AI tools,” on top of the 500 cuts announced last month. Customer service teams in Glasgow, Edinburgh, Cardiff, Leicester, Stockport, and Leeds will be affected over the next two years.

Some positions will disappear when employees leave and are not replaced, while the remaining cuts will come through redundancies. Trade unions have warned that Centrica’s AI investment will hand hundreds of human jobs to chatbots.

Read more
Intel just pulled its 14A production schedule forward by a year
Risk production for 14A is now planned for late 2027
Intel Core Ultra Desktop CPU

Intel has moved up the schedule for its next-generation 14A (1.4-nanometer) manufacturing process, giving its foundry turnaround an important new target.

During Intel’s Q2 2026 earnings call, CEO Lip-Bu Tan said 14A risk production for internal products is now planned for the second half of 2027. High-volume production is expected to begin in 2028. This is earlier than the previous timeline, when Intel was expected to begin risk production in 2028 and move to volume production in 2029.

Read more