Skip to main content

NASA’s mega moon rocket arrives at launchpad (again)

NASA’s next-generation SLS rocket and Orion spacecraft have arrived on the launchpad at the Kennedy Space Center ahead of a second attempt at a key preflight test.

NASA’s Space Launch System (SLS) rocket and Orion spacecraft arrived at Kennedy’s launch complex 39B following a four-mile, eight-hour journey from the facility’s Vehicle Assembly Building.

Recommended Videos

Carried by one of NASA’s low-slung crawler vehicles that moves at no faster than 1 mph, the SLS and Orion vehicles reached the launchpad at about 8:20 a.m. ET on Monday, June 6.

The space agency shared several images of the 332-feet (98.1-meter) rocket in position:

📸 Rollout photos!

In the early hours of the morning, @NASAGroundSys transported the SLS rocket and @NASA_Orion spacecraft to launch pad 39B for the next wet dress rehearsal test ahead of #Artemis I. Catch a live view of the rocket at the pad HERE >> https://t.co/c4PCzejcLt pic.twitter.com/CE7WIQtsZc

— NASA_SLS (@NASA_SLS) June 6, 2022

In preparation for the Artemis I lunar mission, the SLS rocket will undergo a so-called “wet dress rehearsal” no earlier than June 19. This important pre-launch procedure involves filling the rocket’s tanks with fuel and performing a mock countdown.

Prior to the rehearsal, NASA engineers will spend some time securing the SLS rocket and mobile launcher to ground support equipment.

This is the second time for the SLS rocket and Orion spacecraft to be transported to the launchpad for a wet dress rehearsal. But after reaching the launchpad in March, a rehearsal in early April was called off after engineers identified a number of technical issues.

As a result, the vehicle was rolled back to the Vehicle Assembly Building so the issues could be addressed.

Once the SLS rocket achieves a successful wet dress rehearsal, the vehicle will be deemed ready for its first mission, Artemis I.

The uncrewed test mission will use the SLS to power the Orion toward the moon. The spacecraft will perform a flyby of our nearest neighbor before returning to Earth.

A successful flight will pave the way for Artemis II, which will take the same path but this time with astronauts aboard the Orion.

If NASA is fully satisfied with the performance of both the SLS and the Orion, Artemis III will land the first woman and first person of color on the lunar surface in what will be the first crewed lunar landings since the final Apollo mission in 1972. Artemis III is currently scheduled for no earlier than 2025.

The Artemis program is seeking to launch a new era in lunar exploration with a view to establishing the first long-term presence on the moon. NASA said that it aims to “use what we learn on and around the moon to take the next giant leap: Sending the first astronauts to Mars.”

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Watch NASA’s SLS rocket take one small step toward the Artemis II moon mission
The core stage of NASA's SLS rocket.

Artemis II Core Stage Moves to High Bay 2

Although it won’t be blasting off until mid-2026 at the earliest, preparations are already well underway for the launch of NASA’s highly anticipated Artemis II mission.

Read more
Relive Orion’s historic homecoming exactly two years ago
relive orion homecoming two years ago return

NASA’s Artemis I Mission Splashes Down in Pacific Ocean

It was two years ago on December 11 when NASA’s Orion spacecraft splashed down in the Pacific Ocean west of Mexico's Baja California in a mission that effectively marked the launch of the space agency’s ambitious Artemis program, which plans to send astronauts back to the moon and construct a permanent lunar base.

Read more
NASA pushes back its Artemis moon missions due to heat shield issues
The Orion crew module for NASA’s Artemis II mission.

NASA has announced that it is delaying its ambitious Artemis II and Artemis III missions, which will see astronauts travel around and then land on the moon for the first time in over 50 years. The missions will be pushed to April 2026 and mid-2027 respectively, which is around six months later than previously planned.

The delay is due to problems with the Orion spacecraft's heat shield. Orion is the capsule in which crew members for each mission will travel, and it must withstand temperatures of nearly 5,000 degrees Fahrenheit during re-entry through the Earth's atmosphere. On the previous Artemis I mission in 2022, the Orion capsule was used in an uncrewed test and fared generally well, completing the mission as planned.

Read more