Skip to main content

Watch NASA’s mega moon rocket blast its engines in prelaunch test

NASA's Second Hot Fire Test for the Artemis Moon Rocket

NASA has completed a successful test of the core stage of its powerful next-generation Space Launch System (SLS) rocket.

The ground-based event took place at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, on Thursday, March 18.

Related Videos

All four of the rocket’s RS-25 engines blasted at full power for 8 minutes and 19 seconds, simulating a real launch.

Known as a “hot fire,” Thursday’s test marked a critical milestone ahead of NASA’s upcoming Artemis I mission that will send an uncrewed Orion spacecraft on a test flight around the moon and back to Earth. Artemis I will pave the way for a crewed mission taking the same path, and then a moon landing that will put the first woman and next man on the lunar surface. In the longer term, the rocket could also be used to launch astronauts to Mars.

The test, which you can see in the video at the top of this page, will provide NASA engineers with important data for validating the core stage design for the rocket’s first launch to space.

John Honeycutt, manager for the SLS Program at NASA’s Marshall Space Flight Center in Huntsville, Alabama, said Thursday’s event “provided the wealth of data we needed to ensure the SLS core stage can power every SLS rocket successfully.”

This week’s full-length fire tested a range of operational conditions, including moving the four engines in specific patterns to direct thrust, and throttling down and back up, as they will during flight.

“Today is a great day for NASA, Stennis, and this nation’s human space exploration program,” said Stennis Center Director Richard Gilbrech. “This final test in the Green Run series represents a major milestone for this nation’s return to the moon and eventual mission to Mars. So many people across the agency and the nation contributed to this SLS core stage, but special recognition is due to the blended team of test operators, engineers, and support personnel for an exemplary effort in conducting the test today.”

Thursday’s four-engine hot fire test is the first since NASA conducted the same procedure in January 2021, which marked the first time that all four SLS rocket engines were  fired at once. An apparent anomaly prompted engineers to end that test after about one minute.

The data from the latest test will allow NASA to determine whether it can stick to the provisional November 2021 date for the Artemis I moon mission. Digital Trends will be sure to report the news as soon as it’s announced.

Editors' Recommendations

NASA and SpaceX target new Crew-6 launch date after scrubbed effort
Crew-6 astronauts aboard a SpaceX Crew Dragon capsule.

After NASA and SpaceX scrubbed the launch of Crew-6 just a couple of minutes before lift-off early on Monday morning, officials have announced they're now targeting Thursday for the next launch effort.

The team called off Monday’s launch attempt at the Kennedy Space Center in Florida when it suddenly encountered an issue in the ground systems affecting the loading of the ignition fluids for the Falcon 9 rocket that will carry the astronauts to the International Space Station (ISS) inside the Crew Dragon Endeavour capsule.

Read more
Watch NASA’s trailer for SpaceX’s Crew-6 astronaut launch
A SpaceX Falcon 9 rocket carrying the Crew-4 astronauts launching from the Kennedy Space Center.

NASA and SpaceX are making their final preparations for the first crewed launch from U.S. soil to the International Space Station (ISS) since October 2022.

Traveling aboard the Crew Dragon Endeavour spacecraft early on Monday will be NASA astronauts Stephen Bowen and Warren Hoburg, United Arab Emirates astronaut Sultan Alneyadi, and Roscosmos cosmonaut Andrey Fedyaev.

Read more
NASA, SpaceX delay Crew-6 launch to space station
SpaceX's Crew-6 astronauts.

Following a flight readiness review on Tuesday, NASA and SpaceX have decided to delay the Crew-6 launch to the International Space Station by about 24 hours.

The additional time will enable launch personnel to sort out some relatively minor issues with the launch vehicle, officials said.

Read more