Skip to main content

Rumor: iOS 7 to get ‘significant’ overhaul, though development is behind schedule

iphone-5-mainOn the same day that news emerged suggesting a summer launch for an expected iPhone 5S, there have also been claims that work on the next iteration of Apple’s mobile operating system, iOS 7, has fallen behind schedule.

According to high-profile Apple enthusiast and blogger John Gruber, an unnamed source told him that the team working on iOS 7 is so concerned that it’s pulled a bunch of engineers from the Mac 0S X 9 development team to help get the schedule for the mobile operating system back on track and ready for a possible unveiling at its annual Worldwide Developer Conference event, usually held in June. That could also be when the Cupertino company pulls the wraps off the iPhone 5S.

Gruber added that with iOS 7 we can expect a “rather significant system-wide UI overhaul”. In fact, it’s apparently so different that iOS engineers testing it out in the field “have some sort of polarizing filter on their iPhone displays, such that it greatly decreases viewing angles, thus making it difficult for observers to see the new look.” Secretive Apple, eh.

A UI refresh fits in with a recent report suggesting Apple design guru Jony Ive is working on the expected new look, which will apparently be stark and simple and with a “flat design”. However, one difference between that report and Gruber’s comments is that while Gruber says the alterations are “apparently rather significant”, the WSJ believes the changes will be “pretty conservative”.

For Ive and his team, the challenge is to present something new and exciting – the UI is looking a bit dated now, after all – but not so different that it causes confusion or annoyance among iDevice users, something which could risk breaking the bond carefully developed by Apple over the years between itself and its loyal customer base.

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
I found 16 new widgets for iOS 17 that you have to try
A selection of widgets on an iPhone home screen.

Widgets have long been a popular feature on iPhones. Since the release of iOS 17, they have become more interactive, providing a more engaging experience. Interactive widgets allow you to perform important actions from your iPhone's home screen. For example, you can complete your to-do lists, play and pause media and podcasts, control your smart home devices, and much more — all without opening any apps.

Interactive widgets are not limited to Apple's built-in apps on iOS 17. Third-party developers are also adopting this new feature. Although not all apps offer interactive widgets, there are plenty that do. Here are a few interactive widgets that are worth exploring.
Calculator 17

Read more
Your iPhone just got a new iOS update, and you should download it right now
iPhone 15 Pro display with iPhone 15 Pro Max in background.

Apple has just released a new security update, iOS 17.4.1. This comes a little over two weeks after iOS 17.4, which was a big update. iOS 17.4.1 doesn't add any new features, but it's still an important update you'll want to download as soon as you can.

With iOS 17.4.1, Apple states that the update “provides important bug fixes and security updates and is recommended for all users.” Apple doesn’t mention any specifics of these bug fixes, but more details on what this security update addresses may be revealed at a later date.

Read more
How to use photo cutout to cut and paste images in iOS 17
The image background remover feature from iOS 16 being used on a photo of a dog.

The iPhone has so many clever and fun little features that it's easy to miss some of them. One of the most whimsical features to come along in recent years is the ability to lift the subject of a photo away from the background so you can use it elsewhere — whether that's sharing it in an email, pasting it into a photo editing app, or even turning it into an iMessage sticker in iOS 17.

What's especially fascinating about this is that it seems like such a simple thing to do — and Apple does make it really easy — but there's a ton of number crunching going on under the hood to make it happen. This means you'll need an iPhone with a reasonably modern processor, but the good news is that it doesn't have to be the latest and greatest iPhone 15 Pro. While the insanely powerful A17 Pro chip in Apple's flagship smartphone surely helps things along, this feature can be used on any iPhone with an A12 Bionic chip or later, which goes back to the 2018 iPhone XS and iPhone XR.

Read more